NSC Projects (P) Ltd - CONCOR
Retaining/Boundary Wall MMLP Ahmedgarh-Punjab
- Amount (Cr) : 10.88
- Period: 12 Months
- Status: Completed in 2016

Ashoka Buildcon Limited - NHAI
4/6 Lanning of NH 95 (Kharar - Ludhiana) which includes earthwork, WMM, CTSB and Drain, VUPS and Box culverts. Also includes laying ofDBM and BC. (Design CH 41.500 to 57.800 at NH - 05)
- Amount (Cr) : 24.25
- Period: 15 Months
- Status: Completed in 2020

NSC Projects (P) Ltd - AAI
Extension of existing Apron and associated works at Dehradun Airport. Work includes WMM, DLC and PQC withslip form paver.
- Amount (Cr) : 19.00
- Period: 12 Months
- Status: Completed in 2020

GR Infra projects Limited
Construction of 8 lane access-controlled Expressway Vadodara Mumbai Expressway (Phase1 Package 6).
- Amount (Cr) : 54.81
- Period: 15 Months

Kalpataru Power Transmission Limited - RVNL
Doubling of Railway Track from Rajpura to Kakrala work includes Earthwork, Blanketing and Ballast Supply and P-Way Works
- Amount (Cr) : 51.23
- Period: 24 Months
- Status: Completed in 2016

Kalpataru Power Transmission Limited - NR
Construction of New B.G. Line from Mukeria to Talwara including RUB, Major Bridges and Retaining walls.
- Amount (Cr) : 75.24
- Period: 24 Months
- Status: Completed in 2016

Kalpataru Projects International Limited - NR
Construction of New B.G. Line from Chandigarh to Baddi including Earthwork & Viaduct.
- Amount (Cr) : 101.35
- Period: 24 Months
- Status: 5% Completed

North Eastern Railway
Supplying, Fabrication and erection of Foot over bridge of specified spans with structural steel at MAU and Varanasi city in Varanasi division under Amrit Bharat Scheme.
- Amount (Cr) : 15.29
- Period: 09 Months
- Status: Mobilization Stage

Northern Ralways
Earthwork, in cutting/filling, Blanketing, Viaduct, protection works and allied works between Km 82.869 to Km 84.400 within Punjab area for construction of new line from Kartoli Punjab to Talwara block section of Nangal Dam- Talwara new B.G. Rail link.
- Amount (Cr) : 103.10
- Period: 15 Months
- Status: Mobilization Stage

ITD Cementation India Limited
Development of Ganga Expressway (Group-IV) from Km. 445+000 to Km. 601+847 on DBFOT (Toll)basis
- Amount (Cr) : 25.63
- Period: 18 Months
- Status: Mobilization Stage